In connection with a desire for inserting new ferry services in a Scandinavian port, Seaport was requested to carry out an analysis and dynamic event based simulations to understand the possibilities for bringing down the time for carrying out the ferry discharge and loading operation of two ferries, and the possibility to insert a third ferry between two existing ferry calls.